Free checklist for PE-owned companies

100-Day IT Assessment Checklist

20 checks for the technology lead of a newly acquired company: what to check, what evidence to collect, and what to decide in the first 100 days.

On iPhone, choose Download, then open it in Word.

Word (.docx), 6 pages, with owner and status columns to fill in. Free to use and adapt inside your own organization. Please do not resell or republish it without written permission from M.T. Papas Technology Advisory, LLC.

How to use this checklist

This checklist is a 100-day plan for the technology lead of a newly acquired, PE-owned company. It lists 20 checks, the evidence to collect for each, and the decisions they should lead to.

The first 100 days turn diligence findings into an operating agenda. Work in three phases and collect evidence for every item, so each finding can be shown to the sponsor, not just asserted.

  1. Before close and Days 1-30, know what you bought. Stabilize and inventory: who has access, what is backed up, what you paid for, what is contractually locked in.
  2. Days 31-60, assess and decide. Test architecture, platforms, and the security baseline against a recognized framework, then rank what to fix.
  3. Days 61-100, commit and sequence. Convert findings into a funded roadmap, with owners, go-live criteria, and a reporting cadence.

How the checks are sequenced. Documents you can get on or before close come first, because they take the longest to arrive and some clocks start at close. Then come the highest-risk items, so likely entry points are checked before the inventory work. “Before close” assumes you have data-room access; if you do not, request those items on day 1.

Two rules apply throughout

Escalate anything on the stop-and-escalate list within 24 hours of finding it, not at the next steering meeting. Never let a deadline replace documented readiness criteria; public IT failures have followed a go-live approved before readiness was demonstrated.

To track an owner, due date, and status for each check, use the Word version; its last column is yours to fill in.

Checks 1-10

Before close and Days 1-30: know what you bought

The goal is to compile a factual inventory and an initial list of risks, with no redesign yet.

Checks 1 to 10, before close and Days 1 to 30
# Check Start What to look at Evidence to collect Why it matters
1 Contracts, licensing, and spend baseline Before close Run-rate by vendor, top ten contracts (EA, CSP, ERP, SaaS), licensed entitlements versus actual use, renewal dates (including auto-renew) inside 12 months, and true-up exposure Contract, licensing, and spend register The baseline every savings claim is measured against
2 Change-of-control terms Before close Clauses in software, telecom, and managed-service contracts that the acquisition triggers Clause summary with notice dates A change of control can trigger surprise fees, shortfall fees, true-ups, and termination rights, often in the first quarter after close. Notice and consent windows can start at close, so read these first.
3 Incident history Before close Incidents in the last three years, notifications made, regulator contact, and answers given on the cyber-insurance application Incident log; insurance application; latest assessment report Undisclosed incidents can change a deal’s price or terms after signing
4 Compliance scope Before close Identify which obligations apply (PCI-DSS, HIPAA, state privacy law, customer security commitments) and current status Scope statements; latest attestation Customers, lenders, and auditors will ask for proof. In multi-location companies, the most scrutinized IT compliance items include: PCI-DSS, SOC 2 Type I & Type II, Data Privacy, IT General Controls, Network Segmentation & Access Control, Endpoint & Patch Management.
5 Privileged accounts Request before close Every admin account across cloud, network, ERP, and payment systems, and its owner Account list with owner and last sign-in Admin accounts nobody monitors are how an acquired company’s weaknesses become yours
6 MFA coverage Days 1-30 MFA on email, remote access, admin, and vendor accounts Enrollment counts and the exceptions list Credential abuse opened 13% of breaches in Verizon’s 2026 report; MFA is the standard control against it
7 Third-party access Request before close Each vendor with remote or network access, and how they connect Vendor access register with last review date Third parties were involved in 48% of breaches in Verizon’s 2026 report, a 60% increase over the prior year. Only 23% of third-party organizations fully fixed missing or weak MFA on their cloud accounts.
8 Backups and recovery Days 1-30 Last successful restore test of the critical systems; an offline or immutable copy Dated restore-test record A backup that has never been restored is an assumption
9 Detection and response Days 1-30 Who watches alerts, at what hours, and with what response time? Has the incident plan been exercised? Alert-ownership map; date of last exercise Alerts nobody owns go unread, which is how an active intruder stays undetected.
10 Patch and unsupported software Days 1-30 Unsupported operating systems and applications; patch age on internet-facing systems Vulnerability scan output with patch age Vulnerability exploitation opened 31% of breaches in Verizon’s 2026 report, the most common way in. Only 26% of critical known-exploited vulnerabilities were fully fixed, with a median of 43 days to do it.

Checks 11-16

Days 31-60: assess and decide

Test what was found against a recognized standard and rank the fixes by risk and cost. NIST Cybersecurity Framework 2.0 is the neutral yardstick: it has six functions (Govern, Identify, Protect, Detect, Respond, Recover), and NIST publishes a free quick-start guide for smaller organizations.

Checks 11 to 16, Days 31 to 60
# Assessment What to assess Output
11 Microsoft 365 and Azure tenant Is there conditional access in the tenant? Is there admin separation? What is the Secure Score (M365/Azure)? How is the tenant’s identity and structure set up (custom email domains, Global Address List, sync requirements, SSO federation chains)? Is email authentication (SPF, DKIM, DMARC) in place and enforced? Is there a Bring Your Own Device (BYOD) mobile access policy, and what does it require? Are Data Loss Prevention (DLP) policies in place, and how are they enforced? Tenant review with a ranked fix list
12 Network design How are sites connected (VPN, SD-WAN, carrier circuits), and can a compromise at one site reach the others? Are payment and clinical systems segmented from general user and guest traffic? Are there single points of failure in the WAN? Network diagram with the segmentation gaps marked
13 Site and network inventory Locations, circuits, carriers, equipment, and which are standard versus one-off. A standardized site survey (assets, network segmentation, local MSPs, and how equipment is bought, installed, and maintained) shows where hardware and software depart from standard. Request the register before close, then confirm it on site. Site register with exceptions from standard marked
14 Security baseline against NIST CSF 2.0 Score each of the six functions on one consistent scale. Where is the largest gap to what the business actually runs? If the company already reports against another framework, such as CIS Controls or ISO 27001, use that one. NIST’s quick-start guide to the CSF Tiers defines the four Tiers. One-page score by function, with the top five gaps
15 Add-on integration readiness Can the company absorb the next acquisition through a repeatable playbook covering identity, network, security, and finance data onboarding? Draft integration playbook, staffing projection, and a readiness rating. Phased timeline sequencing tenant-to-tenant migrations, identity federation, platform standardization, and legacy system decommissioning or replacement.
16 Savings candidates Build a current-state licensing model and telecom spend projection. Identify the cost of duplicate tools and MSP support. Build a circuit consolidation projection. Savings list with an estimated range and confidence

Checks 17-20

Days 61-100: commit and sequence

Turn the assessment into a funded plan the sponsor can hold you to.

Checks 17 to 20, Days 61 to 100
# Commitment What it contains Output
17 Prioritized roadmap Fixes and projects ranked by risk reduction, value, and dependency, in 30/90/180-day horizons Three-horizon roadmap
18 Business cases Cost, hard benefit, soft benefit, and risk for each major item, in the sponsor’s terms One-page case per item
19 Go-live criteria Written, measurable readiness criteria for every platform change; defect counts reported unfiltered to the steering group Go/no-go standard
20 Staged cutover and rollback Phases instead of a single big-bang switch, and a tested way back for each Cutover plan with rollback steps

Stop and escalate

Tell the sponsor in writing within 24 hours of finding any of these, and before the next scheduled report.

  • Evidence of an active intruder: unknown admin accounts, or security alerts nobody has reviewed.
  • An incident or breach that the deal team, regulators, customers, or the insurer have not been told about.
  • Cyber-insurance application answers that do not match what you find (for example, MFA stated as enforced when it is not).
  • No restorable backup of finance, customer, or patient systems.
  • Payment or clinical systems running unsupported software, or reachable from vendor connections on a flat network.
  • A change-of-control clause that ends or reprices a critical contract.
  • The one person who holds critical knowledge has resigned or is about to.

Day-100 deliverables

Five documents the sponsor should hold by day 100.

Day-100 deliverables
DeliverableBuilt fromOwner
Technology inventory and risk registerChecks 1-10, 13Technology lead
Security baseline score and gap planChecks 11, 12, 14Technology lead with security owner
Integration playbook and readiness ratingCheck 15Technology lead
Savings listCheck 16Technology lead with finance
Roadmap with go-live standardChecks 17-20Technology lead with steering group

Sources

Want a second set of eyes on your first 100 days?

Book a 30-minute discovery call to talk through your own situation.